صفحه اصلی > دانش > محتوای

توجه به عمل از پارچه Stenter ماشین

Apr 22, 2023

When the fabric setting machine is running, the staff needs to adjust the "feed speed" according to the standard, thickness and embroidery density of the processed product. Generally speaking, when the guide cloth needs to be inserted into the cloth take-up device after passing through the heating zone, it is necessary to check the product quality and give timely feedback. If it is not suitable, it should be adjusted in time. After the setting is completed, the heating switch of the equipment should be set to off ten minutes in advance. After that, adjust its operation to a low-speed operation state, and then turn off the main power supply when the demand ratio and the temperature of the fabric setting machine equipment drop to about 80 degree . It should be noted that after the equipment has been working for 60 hours, the covers on both sides of the heating chamber should be opened, the driving parts should be checked and cleaned, and lubricating oil should be added according to the situation. When the working time of the Fabric Stenter Machinery reaches 100 hours, the staff needs to carefully check whether the wires, circuits, heating pipes and connecting parts are damaged, aged or loose, and deal with them in time. Since this equipment is an electric heating equipment, reliable grounding should be ensured when shaping chemical fiber fabrics to ensure safety.

ارسال درخواست